Chinese firm completes beam closure along China-Laos railway
                 Source: Xinhua | 2019-01-20 09:15:42 | Editor: huaxia

The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

Back to Top Close
Xinhuanet

Chinese firm completes beam closure along China-Laos railway

Source: Xinhua 2019-01-20 09:15:42

The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

010020070750000000000000011100001377588261
美国午夜福利性色在线,精品国产欧美一区二区,免费大片黄在线观看网站,欧洲在线免费高清在线a
老色鬼久久亚洲AV综合 | 婷婷丁香五月六月综合激情啪 | 视频电影免费久久 | 亚洲欧美国产日韩中文字幕 | 欧美日韩国产一区二区三区地区 | 思思99思思久久最新地址精品 |