World's highest-altitude grid project starts construction in Tibet

Source: Xinhua| 2019-09-17 23:20:00|Editor: Mu Xuequan
Video PlayerClose

BEIJING, Sept. 17 (Xinhua) -- The world's highest power transmission and transformation project started construction Tuesday in the Tibet Autonomous Region.

With a total length of 1,689 km, the project, which goes from Xigaze city to Ali Prefecture, stretches across permafrost, no man's land and swamps.

The project requires a total investment of 7.4 billion yuan (about 1.05 billion U.S. dollars) and is planned to be completed in 2021, benefiting nearly 380,000 people along the line.

With towers at an average elevation of over 4,000 meters, the project is said to be an extremely difficult "power heaven road" due to the harsh construction environment, dangerous road conditions, poor logistics support and strict environmental protection requirements.

The project connecting 10 Tibetan counties will end the days when the power grid of the Ali Prefecture is isolated from the rest of Tibet, thus improving the reliability of power supply in the prefecture, industrial sources said.

It will also help Tibet's poverty reduction and paves the way for the supply of Tibet's clean energy to South Asia, the sources said.

Since 2007, the State Grid Corporation of China has injected 14.5 billion yuan into Tibet's power grid construction, effectively improving the local power supply.

TOP STORIES
EDITOR’S CHOICE
MOST VIEWED
EXPLORE XINHUANET
010020070750000000000000011105091383992831
美国午夜福利性色在线,精品国产欧美一区二区,免费大片黄在线观看网站,欧洲在线免费高清在线a
亚洲国产精品久久久天堂不卡海量 | 日本高清无卡码一区二区久久 | 综合在线精品视频专区 | 五月丁香六月婷在线综合 | 日本中文字幕一区精品在线 | 亚洲午夜一区二区 |